Preventive action
PAS 55-1:2008, Asset Management: Part 1: Specification for the optimized management of physical assets, written by the Institute of Asset Management, and published by BSi in September 2008, defines preventive action as: ‘action to eliminate the cause of a potential nonconformity or other undesirable potential situation NOTE 1 There can be more than one cause for a potential nonconformity. NOTE 2 Preventive action is taken to prevent occurrence whereas corrective action is taken to prevent recurrence. [BS EN ISO 9000:2005, 3.6.4]’
It defines nonconformity as: ‘non-fulfilment of a requirement [BS EN ISO 9000:2005, 3.6.2; BS OHSAS 18001:2007, 3.11] NOTE A nonconformity can be any deviation from: asset management system requirements; relevant work standards, practices, procedures, legal requirements, etc.’
See also: Preventive maintenance and Planned preventive maintenance.
[edit] Related articles on Designing Buildings
- Asset.
- Asset information model.
- Asset management.
- Asset management strategy.
- Asset management team.
- Creating an asset register for construction projects.
- Digital asset management.
- Enterprise asset management.
- Facilities management.
- Knowledge asset management.
- Planned preventive maintenance.
- Preventive maintenance
- Property management.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
National Scheme of Delegation introduced.
The cost of employing people remains a concern.
Code of Practice for Electrical Energy Storage Systems.
ECA calls on members to comment on draft 4th edition.
Bringing together expertise and creating cultural benefits.
CIOB celebrates positive Ofsted report.
The Building Safety Regulator announces a call for evidence.
Government approach could undermine delivery and regeneration.
World's first mass timber data centre.
The overlooked environmental aspect of data centre development.
Introduction to radon awareness
New technical information sheet published by CIOB.
Updated supplier guide can help electrical contractors engage with NHP.